Please enable JavaScript to use CodeHS

GA FCP: MS-CS-FCP-4.2

CodeHS Lessons

Utilize the design process to brainstorm, implement, test, and revise an idea.

Standard
25.21 Putting Together Control Structures
Standard
5.1 Define Your Product
7.2 Planning Your Site
Standard
10.2 Planning Your Site
16.1 Define Your Product
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
3.10 Top Down Design
3.19 Putting Together Control Structures
Standard
6.10 Top Down Design
6.19 Putting Together Control Structures
Standard
13.10 Top Down Design
13.19 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
12.4 Final Project
15.1 Advanced Challenges with Tracy
Standard
3.5 Top Down Design
8.1 Putting Together Control Structures
9.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
3.5 Top Down Design
6.1 Putting Together Control Structures
Standard
2.10 Top Down Design
2.19 Putting Together Control Structures
13.1 Advanced Challenges with Tracy
Standard
2.10 Top Down Design
2.22 Putting Together Control Structures
16.1 Advanced Challenges with Tracy
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
3.10 Top Down Design
3.19 Putting Together Control Structures
4.1 Practice PT: Pair-Programming Paint!
Standard
18.10 Top Down Design
18.19 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
10.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
7.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
3.10 Top Down Design
3.19 Putting Together Control Structures
Standard
3.10 Top Down Design
3.20 Putting Together Control Structures
Standard
1.11 Top Down Design
1.20 Putting Together Control Structures
Standard
1.11 Top Down Design
1.20 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
16.21 Putting Together Control Structures
Standard
16.21 Putting Together Control Structures
Standard
3.5 Top Down Design
6.1 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project
Standard
8.3 Final Project
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
11.21 Putting Together Control Structures
Standard
6.2 Planning Your Site
Standard
11.2 Planning Your Site
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.4 Final Project