Please enable JavaScript to use CodeHS

NV CS&A: 9-12.CT.C.1

CodeHS Lessons

Collaborate to break problems into component parts, identify key pieces, and use that information to problem-solve.

Standard
25.21 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
2.6 Top Down Design and Decomposition in Karel
2.16 Karel Challenges
3.10 Top Down Design
3.19 Putting Together Control Structures
Standard
2.6 Top Down Design and Decomposition in Karel
2.16 Karel Challenges
6.10 Top Down Design
6.19 Putting Together Control Structures
Standard
1.6 Top Down Design and Decomposition in Karel
1.16 Karel Challenges
13.10 Top Down Design
13.19 Putting Together Control Structures
Standard
1.6 Top Down Design and Decomposition in Karel
1.16 Karel Challenges
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
12.1 Arduino Challenges
12.4 Final Project
Standard
14.1 Arduino Challenges
14.4 Final Project
Standard
3.5 Top Down Design
8.1 Putting Together Control Structures
9.1 micro:bit Challenges
9.4 Final Project
Standard
10.1 micro:bit Challenges
10.4 Final Project
Standard
3.1 micro:bit Challenges
3.4 Final Project
Standard
3.1 Arduino Challenges
3.4 Final Project
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
3.5 Top Down Design
6.1 Putting Together Control Structures
Standard
2.10 Top Down Design
2.19 Putting Together Control Structures
Standard
10.4 Project Prep and Development
Standard
11.4 Project Prep and Development
Standard
2.10 Top Down Design
2.22 Putting Together Control Structures
Standard
11.5 Project Prep and Development
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
12.4 Project Prep and Development
Standard
3.10 Top Down Design
3.19 Putting Together Control Structures
Standard
11.4 Project Prep and Development
Standard
18.10 Top Down Design
18.19 Putting Together Control Structures
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
10.1 micro:bit Challenges
10.4 Final Project
6.6 Top Down Design and Decomposition in Karel
6.16 Karel Challenges
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
10.4 Project Prep and Development
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
7.1 micro:bit Challenges
7.4 Final Project
14.6 Top Down Design and Decomposition in Karel
14.16 Karel Challenges
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
3.10 Top Down Design
3.19 Putting Together Control Structures
8.6 Top Down Design and Decomposition in Karel
8.16 Karel Challenges
Standard
3.10 Top Down Design
3.20 Putting Together Control Structures
3.21 Project: PSA Image
4.17 Project: PSA Homepage
6.4 Project Prep and Development
Standard
12.4 Project Prep and Development
Standard
9.4 Project Prep and Development
Standard
1.11 Top Down Design
1.20 Putting Together Control Structures
Standard
1.11 Top Down Design
1.20 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
12.6 Top Down Design and Decomposition in Karel
12.16 Karel Challenges
Standard
16.21 Putting Together Control Structures
Standard
16.21 Putting Together Control Structures
Standard
12.4 Project Prep and Development
Standard
8.4 Project Prep and Development
Standard
9.4 Project Prep and Development
Standard
14.5 Project Prep and Development
Standard
3.5 Top Down Design
6.1 Putting Together Control Structures
Standard
10.4 Project Prep and Development
Standard
10.4 Project Prep and Development
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
8.1 micro:bit Challenges
8.3 Final Project
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
11.21 Putting Together Control Structures
Standard
3.6 Top Down Design
8.1 Putting Together Control Structures
Standard
1.10 Top Down Design
1.19 Putting Together Control Structures
15.1 micro:bit Challenges
15.4 Final Project
11.6 Top Down Design and Decomposition in Karel
11.16 Karel Challenges
Standard
10.4 Project Prep and Development